Upload Date: 18-Oct-2023

As per directions of Secretary PHED, Chief Engineer East conducted a Khuli Kachehry at Abbottabad circle. Locals from Abbottabad and Haripur participated in Khuli Kacheri. The demandscompalints of locals were heard and noted. Chief Engineer responded to their queries and ensured its early resolution.

Khulli Katchery Chief Engineer (East) at Abbottabad
Khulli Katchery Chief Engineer (East) at Abbottabad
Khulli Katchery Chief Engineer (East) at Abbottabad
Khulli Katchery Chief Engineer (East) at Abbottabad
Khulli Katchery Chief Engineer (East) at Abbottabad